Temporary Loading Assessments That Reduced Unnecessary Backpropping
Pragmatic temporary loading assessments that reduced unnecessary backpropping and programme disruption.
Client
West End Gate
Service provided
Temporary works design and design checking
Service
Temporary works designChallenge
The project needed pragmatic assessment of temporary loadings on RC slabs without unnecessary disruption to internal trades.
What we delivered
Temporary works design and design checking
Outcome
Analysis frequently negated the requirement for backpropping, reducing costs for propping schemes and adverse effects on internal trades.
“City Temporary Works have provided a swift and efficient service in producing designs and supporting our Temporary Works procedures. Their pragmatic approach frequently negates the requirement for backpropping, reducing costs significantly.”
David Hough
Construction Manager, West End Gate